The project is a three story, 53,000 sf Type II A non-combustible building. The center is currently in the CA phase scheduled for completion by May 2020. The tour will be led by the designer, Ned Reifenstein.
Please have full PPE (personal protective equipment) requirements – please bring your own hard hat to enter the construction site. No open toed shoes will be allowed. Anyone without proper PPE cannot enter the site, no exceptions.
Meeting location is shown below (marked red building)
Where is the meeting location?
Hi Steve,
The meeting location is at the Liberal Arts center. We have included a map to show where the meeting point is!